– This production began in early 110 degrees in early 110 degrees after the fire, the chemical reaction begins.
– Attach to the joint of the building panel, block gaps, and prevent it from spreading through the joint in the event of a fire.
– Even if this sound is irregular, it effectively blocked fire expansion and lower heat conductivity.